Ongoing Projects
Explore more of our ongoing projects
Image
Soil Investigation
A soil investigation project for a building foundation involves a series of systematic steps to assess soil properties and ensure the foundation's stability and suitability. The process typically begins with site preparation, where the area is cleared and the locations for soil sampling are identified. Soil sampling is then conducted, either through boreholes or trial pits, to collect representative samples from various depths. These samples undergo various laboratory tests to determine critical properties. A triaxial test assesses the soil's shear strength and behavior under stress. Sieve analysis determines the particle size distribution of coarse soils, while hydrometer analysis measures the distribution of fine particles. Specific gravity tests provide data on soil density and composition. Based on these tests, engineers evaluate the soil's bearing capacity, compressibility, and overall suitability for supporting the proposed structure. The results guide the design of the foundation, ensuring it can safely support the building's load and withstand environmental factors. The findings also inform any necessary soil treatments or improvements. This thorough investigation helps prevent potential structural issues and contributes to the building's long-term stability and safety.
Image
Residential Apartments Construction
A building construction project typically begins with site preparation, which involves clearing debris and setting out the building layout using pegs and string lines. Next, excavation of trenches is carried out to create the foundation for the structure, ensuring proper depth and level according to design specifications. The placement of reinforcement bars follows, where steel rebars are arranged in the base and columns to provide structural strength. After the columns are reinforced, ground beams are reinforced to connect the columns and help distribute loads. Once the reinforcement is set, filling up the foundation for the damp-proof course (DPC) is done. This involves backfilling and compacting the soil to the appropriate level, then placing a DPC layer to prevent rising moisture. Next, blocks are laid on the DPC, starting the construction of the walls. Lintels are formed above door and window openings to support the weight of the upper walls. After the ground level walls are completed, the first slab is cast. Once cured, block laying continues for the upper floors. At this stage, piping for plumbing and electrical conduits is installed, embedded within the walls as they rise. With piping in place, the construction progresses, maintaining structural alignment and ensuring that all systems are integrated properly for the next phases of the building process. After the upper floors' blockwork and piping are completed, the next phase involves casting the floor slab for the subsequent levels, repeating the same process of laying reinforcement bars and pouring concrete. Once the structural framework is complete, the roofing stage follows. The roofing structure, whether flat or pitched, is built using trusses or beams, and the selected roofing material (e.g., metal sheets, tiles) is installed, ensuring proper drainage and insulation. Next, plastering and rendering are done on both the interior and exterior walls to create smooth surfaces for painting. At this stage, electrical wiring and plumbing systems are finalized, with switches, sockets, water lines, and fixtures installed according to the design. The building then undergoes floor finishing, which may include tiles, terrazzo, or other flooring materials, depending on the design and preference. After the floors are finished, doors and windows are fitted, followed by painting of both the interior and exterior walls. Any additional fixtures and fittings, such as kitchen cabinets, lighting, and sanitary ware, are installed. The building is then subjected to final inspections to ensure that all work meets design and safety standards. Lastly, the site is cleared, and any remaining landscaping or external features such as pathways, drainage systems, or gardens are completed. Once everything is in place and passes inspections, the project concludes with a handover to the client. This marks the successful completion of the building, ready for occupation or use.
Let’s Start Building Your Vision